The Challenge:
China Gold Group's Inner Mongolia Taiping Mining Co. Ltd.'s core crushing plant relied on over a dozen Metso HP800 cone crushers as the backbone of its production line. Ensuring the timeliness, cost-effectiveness of spare parts supply, and overall equipment stability under continuous high-volume operation was critical. The customer needed to find a supplier capable of providing 100% compatible, interchangeable parts and complete machines with reliable quality and stable long-term supply, to reduce dependency on the OEM and control maintenance costs.
The Jinyang Solution:
Jinyang first engaged deeply as a spare parts supplier, providing replacement components for major cast steel parts like the main frame, adjustment ring, and head assembly. Their flawless interchangeability and service life earned customer trust. Building on this, in 2015, the customer decided to install a complete Jinyang JY800 cone crusher in a standby position within the secondary crushing plant, operating alongside the existing Metso HP800 units to further verify the long-term reliability of the domestic machine.
Verified Outcomes:
Seamless Interchangeability: All spare parts provided by Jinyang, including large cast steel components, achieved 100% physical and functional interchangeability with the OEM parts, with no adaptation issues post-installation.
Proven Machine Reliability: Since its commissioning in 2015, the Jinyang JY800 has operated stably for years under a high actual throughput load of up to 50,000 tonnes per day, performing indistinguishably from the adjacent HP800 units.
Official Endorsement: Taiping Mining's equipment department issued a technical report explicitly confirming: "The components and spare parts produced by Jinyang for this equipment are fully interchangeable with the original Metso parts, and their service life meets the standard of OEM spare parts."
Customer Value & Feedback:
This case perfectly illustrates Jinyang's evolution from a "spare parts supplier" to a "critical equipment partner." For mines with substantial investments in imported equipment, Jinyang offers a low-risk, "plug-and-play" solution that requires no modification to existing processes. It proves that Jinyang equipment can not only serve as a reliable source for spare parts but also integrate seamlessly as primary machinery into modern production lines, providing durable operational assurance and significantly enhancing supply chain resilience and cost-control capabilities for the customer.
International Department
Address:Room 412, Building 1, Fenxi Road, Wanjiang Street, Dongguan City, Guangdong Province, China
(with each access to both Shenzhen and Guangdong airports)
Telephone:+86 1580 1697 955 (Phone / WeChat)
Website: www.jsminetech.com
Email: info@jsminetech.com
thomas.bai@jsminetech.com
joseph.liu@jsminetech.com