SUCCESSFUL CASES
Proven Performance from the Field


CITIC Pacific Mining (Australia): Engineering Value Beyond Replacement - Gyratory Crusher Liner Optimization


The Challenge:
CITIC Pacific Mining's SINO iron ore project in Australia utilizes large ThyssenKrupp gyratory crushers 63" x 89". The service life of the original OEM liners was approximately 800,000 tonnes, leading to frequent change-outs, prolonged downtime, high maintenance costs, and impacts on continuous production and economic efficiency. The customer needed not just a reliable alternative liner but sought a technological breakthrough to surpass the original design's performance limits and achieve a leap in cost reduction and efficiency.


The Jinyang Solution:
Jinyang did not offer a simple copycat replacement. Our engineering team conducted an in-depth analysis of the customer's ore characteristics, crusher operating parameters, and the original liner wear patterns. We performed customized cavity profile optimization and material upgrade design. Utilizing advanced simulation technology, we redesigned the liner profile, thickness, and material composition to maximize wear resistance and service life.


Data-Driven Results:
The optimized Jinyang gyratory crusher liners delivered revolutionary improvements far exceeding expectations:

  • Service Life Leap: Liner service life skyrocketed from the OEM's ~800,000 tonnes to an impressive 1.65 - 1.70 million tonnes, representing a service life increase of over 106%.

  • Significant Economic Benefit: The extended replacement cycle, more than doubling the original, effectively reduced associated downtime, labor costs, and change-out frequency by approximately 50%. The amount of ore processed per liner set doubled, drastically reducing the liner cost per tonne of ore.

  • Customer Recognition: For delivering substantial economic value, Jinyang received a special performance bonus from the customer and secured a long-term exclusive supply agreement.


Customer Value & Feedback:
This case transcends the traditional "aftermarket parts" category, showcasing Jinyang's profound expertise in materials science and engineering optimization. We are not just manufacturers but solution engineers capable of creating incremental value for our clients. For global premium customers, Jinyang has demonstrated its ability to optimize the performance of existing core assets through technological innovation, delivering a return on investment that far exceeds simple part replacement. This marks Jinyang's strategic evolution in the aftermarket sector from a "supplier" to a "value-creation partner."



Inner Mongolia Taiping Mining: Seamless Integration & Proven Long-Term Reliability of the JY800

The Challenge:
China Gold Group's Inner Mongolia Taiping Mining Co. Ltd.'s core crushing plant relied on over a dozen Metso HP800 cone crushers as the backbone of its production line. Ensuring the timeliness, cost-effectiveness of spare parts supply, and overall equipment stability under continuous high-volume operation was critical. The customer needed to find a supplier capable of providing 100% compatible, interchangeable parts and complete machines with reliable quality and stable long-term supply, to reduce dependency on the OEM and control maintenance costs.


The Jinyang Solution:
Jinyang first engaged deeply as a spare parts supplier, providing replacement components for major cast steel parts like the main frame, adjustment ring, and head assembly. Their flawless interchangeability and service life earned customer trust. Building on this, in 2015, the customer decided to install a complete Jinyang JY800 cone crusher in a standby position within the secondary crushing plant, operating alongside the existing Metso HP800 units to further verify the long-term reliability of the domestic machine.


Verified Outcomes:

  • Seamless Interchangeability: All spare parts provided by Jinyang, including large cast steel components, achieved 100% physical and functional interchangeability with the OEM parts, with no adaptation issues post-installation.

  • Proven Machine Reliability: Since its commissioning in 2015, the Jinyang JY800 has operated stably for years under a high actual throughput load of up to 50,000 tonnes per day, performing indistinguishably from the adjacent HP800 units.

  • Official Endorsement: Taiping Mining's equipment department issued a technical report explicitly confirming: "The components and spare parts produced by Jinyang for this equipment are fully interchangeable with the original Metso parts, and their service life meets the standard of OEM spare parts."


Customer Value & Feedback:
This case perfectly illustrates Jinyang's evolution from a "spare parts supplier" to a "critical equipment partner." For mines with substantial investments in imported equipment, Jinyang offers a low-risk, "plug-and-play" solution that requires no modification to existing processes. It proves that Jinyang equipment can not only serve as a reliable source for spare parts but also integrate seamlessly as primary machinery into modern production lines, providing durable operational assurance and significantly enhancing supply chain resilience and cost-control capabilities for the customer.



Jiangxi Copper Corporation: The Definitive Field Trial - Jinyang JY500 vs. Metso HP500


The Challenge:
As China's largest copper producer, Jiangxi Copper Corporation (JCC)'s Dexing Copper Mine relied heavily on imported high-end cone crushers (such as the Metso HP series) for critical secondary and tertiary crushing. Facing challenges like long lead times for spare parts, high costs, and dependency on a single supplier, JCC urgently needed to validate the reliability of a domestically produced, high-end alternative to break the monopoly, optimize its supply chain, and reduce total lifecycle costs.


The Jinyang Solution:
In 2015, JCC initiated a bold "head-to-head" field test at its Sizhou Concentrator. A Jinyang JY500 cone crusher was installed side-by-side with an existing Metso HP500, operating under identical feed material, working conditions, and production schedules for a full year of continuous operation. This was not merely a sale but a transparent, performance-based verification.


Data-Driven Results:
The year-long comparative data eliminated all doubts, proving the JY500 not only matched but exceeded the international benchmark in key metrics:

  • Performance Parity: The JY500 consistently met and exceeded the contracted throughput of 400 t/h, achieving an average of approximately 531 t/h. Its product size distribution (%-10mm content) was identical to the HP500.

  • Superior Durability – The Decisive Advantage: The service life of the core wear parts—the mantle and bowl liners—became the defining differentiator. JY500 liner life reached 850-900 hours, a significant improvement over the HP500's approximately 700 hours, representing a more than 20% increase.

  • Quantified Economic Benefit: Based on the extended liner life, competitive initial investment, and lower maintenance costs, JCC calculated that the JY500 delivered total lifecycle cost savings of approximately RMB 4 million.


Customer Value & Feedback:
This successful "PK" provided JCC with direct economic benefits and a reliable second source for high-performance equipment. Following the outstanding performance of the JY500 and the subsequent successful application of JY800 units, JCC has consistently awarded Jinyang the title of "A+ Grade Excellent Supplier" for multiple years. This case stands as the most powerful validation of Jinyang's value proposition: "Performance rivaling imports, with superior cost-effectiveness," providing a credible reference for equipment selection in major domestic mining operations.